Project List: Nov '06 through April '07
1. Install Link 10 Battery Monitor
2. Install Balmar 612 series 100 amp alternator
3. Install Balmar MC-612H Max Charge Regulator
4. Install Balmar Duo-Charge Digital charging system for Optima starting battery
5. Replace zincs and impellers in Perkins 4-154
6. Install new forward bilge pump motor
7. Install 16 new stainless steel portlights
8. Sand and varnish exterior wood.
9. Paint whale stripe Royal Deep Blue using Awlgrip.
10. New non-skid deck paint
11. calk toe-rail
12. New 200' of anchor chain with 100' anchor rode attached.
13. Reuse old 50' chain plus 200' of rode for Danforth anchor
14. Split anchor locker to handle two rodes
15. Install rudder position sensor for autohelm
16. Add Ventair product under all cushions on boat.
17. Replace aft mattress with a memory foam bed.
18. Install TV antenna on mizzen mast
19. Add two LED reading lights, one each in forepeak and aft cabin
20. Replace anchor lamp with LED system.
21. Replace all halogen & incandescent red overnight passage lights with RED LEDs.
0 Comments:
Post a Comment
<< Home